System Specifications

Plan and profile drawings are required showing all water, storm and sanitary
sewer infrastructure as required in the subdivision regulations.

The following provides requirements for laterals and sanitary sewer force mains
and needs to be included in the preliminary plat construction drawings.

System Specifications